The scheme was an existing public house and car parking where LOORC Architects were employed to part demolish and provide a new purpose-built frontage to reflect the corporate requirements for Starbucks.
The main body of the public house was retained and new extension design to the front and a new drive-thru window to the rear together with the associated external works and drive-thru lane.
The scheme also incorporates EV spaces which are to SSE design and specification.